![]() ![]() ![]() ![]() Jacobs Engineering’s Environmental Graphic Design Group (EGDG) worked with the facility’s management team on the pioneering green project. The plan specified five, solar-powered, monument signs. The university’s Board of Trustees included the completion and implementation of the Campus Sustainability Master Plan in its goals for the 2010-2011 academic year. The 300-acre, park-like campus is just 17 miles from Washington’s second largest city, Spokane. It’s now Washington’s fastest-growing public institution, with more than 10,000 students, and EWU’s College of Business and Public Administration ranked in the 2011 edition of The Princeton Review’s annual guidebook, The Best 300 Business Schools. And, among other things, the job required extensive excavation and precast-concrete forming and installation.įounded in 1882 as Eastern Washington State College, EWU offers the state’s best public-education value. Also, such projects require sophisticated energy consumption and storage components to operate in darkness. The jobs included working at a remote site approximately 300 miles from Seattle with weather extremes – a challenge for solar-powered signage. The Sign Factory (TSF) was awarded the bid for five, solar-powered monument signs at Eastern Washington University (EWU). Ken Naasz is design and development VP at The Sign Factory (Kirkland, WA). ![]()
0 Comments
Leave a Reply. |
Details
AuthorWrite something about yourself. No need to be fancy, just an overview. Archives
May 2023
Categories |